Structure

1. Acceptable Structure Type: Masonry
2. Acceptable Foundation: Poured
3. Not Present Differential Movement: No movement or displacement observed.
4. Acceptable Beams: Solid wood
5. Acceptable Bearing Walls: Not visible due to finished walls
6. Marginal Joists/Trusses: 2x10 - Damaged floor joists noted in basement. Recommend repair.
7. Defective Piers/Posts: Steel/Wood - Wood posts are water damaged at the bottom. Recommend replacement
8. Marginal Floor/Slab: Poured slab
9. Defective Stairs/Handrails: Wood stairs with wood handrails
10. Acceptable Subfloor: Dimensional wood