Attic

2nd story Attic
1. Method of Inspection: From the attic access
2. Not Inspected Unable to Inspect: 50%
3. Acceptable Roof Framing: 2x4 Rafter
4. Acceptable Sheathing: Dimensional wood and plywood
5. Marginal Ventilation: Gable and turbine - Attic vents on newer addiion blocked off with styrofoam Recommend removal of blockage
6. Marginal Insulation: Cellulose
7. Marginal Insulation Depth: 4 inches
8. Not Present Vapor Barrier:
9. Defective Wiring/Lighting: Buried Knob and tube - Exposed wiring just inside attic scuttle access. This is a safety hazard. Recommend repair. Live knob and tube wiring present in attic in need of immediate repair. This is a safety hazard. Buried knob and tube wiring present in attic. Evaluation by a licensed electrician is recommended
10. Marginal Moisture Penetration: Water stains noted